News

Infill panels delivered for project in Falkenberg

17.03.2020 08:24


ZTC has started deliveries of infill panels for an apartment house project in Falkenberg, Sweden in February 2020.

The project involves preparing technical drawings, production and delivery of infill panels for two facades of the building that totals 1800 m2. The mixed construction project features a steel structural frame with reinforced concrete floor slabs and wood frame infill panel walling. The facade will be finished with a custom made 3D metal sheeting which requires high precision in infill panel production.

Wood frame infill panels use insulation with especially low R value and lumber of different dimensions than in conventional wooden panel construction to reach the necessary insulation characteristics with limited thickness. ZTC produced infill panels from vapour insulation to wind breaking layer (cement-fiber sheets).



Client reference
We chose Zemgale Technological Center to supply infill panels in project „Stationhus”
because the company has proven with many years of experience in the international market.
Professional and responsible approach to the project at hand characterized the team of ZTC
ZTC supplied infill panels on time and conforming to high quality standards, therefore, we
are very pleased with the work done by ZTC and plan to continue our cooperation.

Jānis Beinārs
Three L Technologies Ltd. project manager