News

Twin house project complete near Gardermoen

17.11.2019 18:57


ZTC has finished work on a two story twin house project near Gardermoen, Norway. ZTC developed construction drawings, produced house elements and installed them without additional carpentry and roofing works on site for the 300 m2 house.

The contract for the construction drawings, production and installation of the house was signed in 2017 with sliding due dates. Such cooperation model let the client to put up for sale the house precisely knowing its price and ZTC had ample time to plan the development of construction drawings so that the house could be installed very quickly after its sale. The project realization was prolonged until the client to sold the project to the future homeowner in 2019.


Scope of ZTC prefab houses work
ZTC developed construction drawings, produced house elements and installed them without additional carpentry and roofing works on site for the 300 m2 house. ZTC delivered and installed windows from cooperation partners. The project also included delivery of detail parts for finishing carpentry and roofing works that were organized by the client.

Client’s impressions on the project: “We are very confident of the job with ZTC and will do more projects with them in the future”. Cooperation in the project was mutually positive and as a result we are looking forward for future projects together and long term cooperation. with the client.