ZTC logo
Back to projects
Interdisciplinary Laboratory for the Institute of Construction and Woodworking

Latvia • Developer project

Interdisciplinary Laboratory for the Institute of Construction and Woodworking

Developer
Interdisciplinary Laboratory for the Institute of Construction and Woodworking image 1

About this project

For the Institute of Construction and Woodworking's interdisciplinary laboratory in Jelgava, ZTC designed, manufactured and supplied insulated wall and roof panels with a combined surface area of 1,900 m². The panels were adapted to the building's load-bearing glulam frames, with 430 mm of insulation incorporated into the roof construction. Panel production took place alongside foundation works and fabrication of the structural frames, reducing the overall construction time. The 740 m² laboratory is intended for research into timber, timber products and structures.

Specifications

Area
740 m²
Floors
1
Year completed
2021
Building type
Developer project

Planning a similar project?

Explore the relevant construction system and project process. To discuss a proposal, send your plans and sections, approximate floor area, construction country and the work you would like ZTC to undertake. If you do not have drawings yet, describe your idea. Package scope, delivery, assembly and timing are agreed for each project.

Discuss your project