ZTC logo
Koka karkasa māju būvniecība
ZTC timber construction

Timber frame houses for individual projects

ZTC manufactures timber frame panels in Latvia and assembles the structures on site. The solution is adapted to the specific project, energy performance target and scope.

ZTC experience and production facts

34+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

What clients say about working with ZTC

Google reviews highlight ZTC’s quality, organised process and professional communication.

Google review

ZTC built my house in 2012, and they have done some reclamation work in two periods since then. Only positive experiences with ZTC! Good quality of workmanship and customer support.

Google review

Ļoti profesionāls un ieinteresēts darbs no ZTC puses, lai maksimāli izpildītu klienta vēlmes mājas būvniecībā, ieguldot laiku visu detaļu precizēšanā, kā rezultātā pašas būvniecības laikā neko nevajadzēja koriģēt un ir tapusi patiesi kvalitatīva māja. Atzinīgus vārdus par mājas būvniecības kvalitāti saņēmām no visiem speciālistiem, ar kuriem sadarbojāmies vēlāk - liekot logus un durvis, jumta segumu un apdari. Paldies par paveikto un varam tikai ieteikt citiem izmantot ZTC pakalpojums māju būvniecībā! Pateicībā, Irēna un Janeks

Factory-made timber frame structures

A timber frame house suits private home projects where precise production, energy performance and predictable on-site assembly matter. ZTC works from a client or architect project, develops the structural solution, manufactures the panels and assembles the structure. See timber frame house cost, timber house price and timber frame vs masonry for related topics, or browse completed ZTC projects.

What ZTC provides and what is planned separately

ZTC provides

  • Timber structural solutions based on the client or architect project.
  • Panel manufacturing in the 4,500 m² factory in Latvia.
  • A CE-marked system with ETA-21/0014 European Technical Assessment.
  • Transport and on-site assembly of the timber structures.

Planned separately

  • ZTC does not prepare architectural drawings.
  • ZTC does not build foundations.
  • External utilities, interior works and building systems must be agreed in the project offer.

Key facts about the ZTC solution

34+ years of experience

ZTC was founded in 1991 and has completed more than 400 projects across 14 European countries.

Factory production in Latvia

Panels are produced in a 4,500 m² factory with 30,000 m² annual panel capacity.

Precise CNC processing

Structural elements are prepared with ±1 mm CNC precision.

Certified system

Timber panel houses carry CE marking and ETA-21/0014 European Technical Assessment.

Energy performance

Depending on the construction, a U-value of approximately 0.12–0.15 W/m²K and n50 < 0.6 are possible.

Frequently asked questions

Answers about timber frame house price, construction process, warranty, foundations and energy performance.

Would you like to review a timber frame project?

Send your project information and the ZTC team will review the structure, scope and next steps.