ZTC logo
Rūpnīcā ražota koka paneļu māja
Factory-made panels

Timber frame panels manufactured in Latvia

ZTC manufactures timber frame panels in controlled conditions, ensuring precision, quality control and predictable on-site assembly.

ZTC experience and production facts

34+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

Why factory production matters

In timber frame panels, a large part of the structure is prepared in the factory rather than entirely on site. This improves control of insulation, membranes and assembly sequence. Compare with timber frame houses, Hundegger CNC production and price guidance.

Timber frame panel production process

The ZTC process starts with a client or architect project. Production happens in the factory, but the final solution always depends on the specific project.

  1. 1.

    Structural solution

    ZTC develops the timber structural solution based on the client or architect project.

  2. 2.

    Material preparation

    Structural elements are prepared with Hundegger CNC precision of ±1 mm.

  3. 3.

    Panel assembly in the factory

    Panels are assembled in controlled factory conditions.

  4. 4.

    Insulation and membranes

    Insulation and membranes are installed according to the selected scope.

  5. 5.

    Transport and on-site assembly

    Panels are delivered to site and assembled in the agreed work sequence.

What clients say about ZTC quality

Google reviews highlight ZTC’s precision, organised process and professional communication.

Google review

Very good experience with all the ZTC staff. Easy to work with, very professional, fast and clear in answering any question during all the projects done. I can only recommend ZTC.

Google review

Lieliska sadarbība! ZTC komanda ar lielu vērību pieiet katrai detaļai, lai gala risinājums apmierinātu visas puses! Iesaku!

What ZTC provides for panel houses and what is planned separately

ZTC provides

  • Timber panel solutions based on the client or architect project.
  • Panel production in the 4,500 m² factory in Latvia with up to 30,000 m² of panels per year.
  • CNC processing with ±1 mm precision and a CE-marked system with ETA-21/0014.
  • Transport and on-site panel assembly.

Planned separately

  • ZTC does not prepare architectural drawings.
  • ZTC does not build foundations.
  • External utilities, interior works and building systems must be agreed in the project offer.

Precision and quality control

CNC precision

Hundegger CNC processing with ±1 mm precision.

Controlled environment

Panels are assembled in a 4,500 m² factory in Latvia.

On-site assembly

Typically around 3–5 days per floor depending on the project.

Transport

Finished panels are delivered to site in a coordinated sequence.

Estimate your indicative budget

The calculator helps compare scopes and prepare an initial budget guide before project review.

Frequently asked questions

Questions about panel technology, construction process and energy performance.

Would you like to review panel production for your project?

Contact ZTC to discuss structure, scope and production options.