
Hundegger CNC production for timber structures
CNC equipment cuts elements precisely in the factory, reducing adjustments on site and making assembly easier to plan.
ZTC experience and production facts
35+
years of experience
400+
completed projects
14
European countries
±1 mm
CNC precision
How precise components help on site
Processing precision of ±1 mm helps panels and joints fit as designed. It reduces the risk of rework and helps the assembly team achieve the specified result. Explore timber frame panels, CLT panels and structural certification.
Factory and CNC parameters
CNC precision
±1 mm
Factory
4,500 m²
Capacity
30,000 m² of panels per year
Assembly
3 to 5 days per floor
What precise production delivers
Fewer corrections
Precisely made elements need fewer adjustments on site.
Predictable assembly
Assembly typically takes around 3 to 5 days per floor, depending on the project.
Quality control
Production takes place in controlled factory conditions.
Export projects
ZTC experience across 14 European countries with a factory in Latvia.
Related ZTC projects

Private residence
Precision Meets Recognition: Building for an Architect
Gelderland, Netherlands
View project
Private residence
Commitment & Trust – Building Homes Through Challenges
, Sweden
View project
Developer project
Industrial Facility Facade with CLT and Infill Panels
, Latvia
View project
Private residence
Authentic-Style Two-Storey House
Amsterdam, Netherlands
View project
Private residence
Modern Coastal House with Curved Timber Structures
Akershus, Norway
View project
Private residence
Sustainable Engineering: The CLT & SiOO:X Home
Leinster, Ireland
View projectRelated topics
- Timber frame panelsInsulated timber frame panels: Comfort, Premium and Lux layers, internal walls, protective barriers, delivery and assembly.
- CLT panelsCLT panels for timber construction: technical parameters, applications and ZTC factory production experience.
- CE and ETA certified timber structuresCE marking and ETA-21/0014 European Technical Assessment for the ZTC timber construction system.
Frequently asked questions
Questions about CNC production, technologies and warranty.
Comfort panels use mineral wool within the frame. Premium and Lux use wood fibre or cellulose insulation; Premium adds a 22 mm wood fibre windproof board, while Lux adds a 40 mm STEICO THERM wood fibre layer. Additional 45 mm internal insulation and plasterboard are excluded from these packages. For Comfort, Premium and Lux, roof panel insulation is 50 mm thicker than the insulation in the corresponding external wall.
Panels are connected with long screws or special timber connectors. A wind barrier is used externally, a vapour control layer internally, and membranes are carefully taped across the building.
Panels are connected with long screws or special timber connectors. A wind barrier is used externally and a vapour control layer internally, with membranes carefully taped across the building.
Airborne sound insulation in timber houses can be very good, especially with cellulose or wood fibre. Impact sound in intermediate floors should be addressed with appropriate floor and ceiling solutions.
Airborne sound performance in timber houses can be very good. Impact sound in intermediate floors is addressed with appropriate floor and ceiling solutions.
For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or where exposed solid timber walls are desired.
For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or exposed solid timber walls.
After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.
After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.
ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.
ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.
ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.
ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.
ZTC houses are designed for a service life of at least 50 years. The standard warranty is 3 years, but in some cases it may be possible to agree an extension to 5 years.
Houses are designed for a service life of at least 50 years. The standard structural warranty is 3 years. In some cases an extension to 5 years may be considered where supported by material suppliers.
Would you like to discuss production capacity?
Contact ZTC about the structural solution and factory capacity for your project.