ZTC logo
Koka paneļu ražošana rūpnīcā
For developers

Timber construction systems for development projects

ZTC delivers timber frame, CLT and hybrid building structure solutions — from early technical review through factory production, delivery and on-site assembly.

ZTC experience and production facts

34+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

Project types often suited to a ZTC solution

Suitability is assessed from project geometry, loads, fire, acoustic, logistics and local requirements.

Residential developments

Repeated building types and housing projects.

Infill façades

Lightweight façade systems for multi-storey frames.

Hybrid structures

Combinations of timber, steel and concrete for complex projects.

Factory production

4,500 m² factory with up to 30,000 m² of panels per year.

Cooperation workflow with developers

Each development project is reviewed individually — from early technical evaluation through production planning, delivery and on-site assembly.

  1. 1.

    Early project review

    ZTC reviews building geometry, loads, fire, acoustic, logistics and local requirements.

    Depends on project readiness

  2. 2.

    Structural solution and scope

    A timber frame, CLT or hybrid solution and delivery scope are agreed according to the project.

  3. 3.

    Production preparation

    Structural details, openings and interfaces with other building parts are coordinated before production.

  4. 4.

    Factory manufacturing

    Panels and structures are manufactured in Vītoliņi with ±1 mm Hundegger CNC precision.

  5. 5.

    Delivery and assembly

    Manufactured elements are transported and assembled on site — typically approximately 3–5 days per floor where applicable.

Timber frame, CLT and hybrid decision criteria

Suitability is assessed from project geometry, loads, fire, acoustic, logistics and local requirements. ZTC compares timber frame panels, CLT panels, infill façade panels and hybrid timber construction. See also business solutions and completed projects.

Project suitability criteria

Often suitable project types

  • Residential developments and repeated building types.
  • Apartment buildings where a timber solution is technically suitable.
  • Infill façade systems and hybrid structures.
  • Project-specific factory production.

Information required for review

  • Architectural plans and building geometry.
  • Intended structural system and loads.
  • Project location and fire/acoustic requirements.
  • Scope of supply, expected programme and local architect/engineer contact.

Responsibility and interface split

ZTC provides

  • Structural solution based on the client or architect project.
  • Factory production, marking and quality control.
  • Transport and assembly according to agreed scope.
  • Technical documentation under CE marking with ETA-21/0014.

Coordinated with the project team

  • Architectural design and planning approvals.
  • Foundations, external utilities and general site management.
  • Local engineers and the approval process.
  • Planning approval is not guaranteed; fixed lead times are not promised.

What partners say about working with ZTC

Google reviews highlight manufacturing quality, organised workflows and professional collaboration on development and export projects.

Google review

We are Premium Living AS in Norway and built two houses with this company. We were very satisfied. We sold the last project 2 years ago when I write this review, and the first house was built 4 years ago. With both houses, the production, planning and timing all went smooth and well organised. Right now, all three buyers are pleased, and we haven't received a single complaint about flaws or even blemishes. Even during the Covid lockdowns there was no doubt that our investments and cooperation with ZTC were solid. We recommend, and anyone that has questions can ask ZTC for our reference.

Frequently asked questions

Answers about technologies, construction process, warranty and payment for development projects.

Submit your project for early review

Contact ZTC to review the structural system, scope of supply and cooperation model.