ZTC logo
Timber engineering and manufacturing support for architects
For architects

Timber engineering and manufacturing support for architects

We coordinate timber frame, CLT, hybrid and infill façade systems with your architect. ZTC does not produce the architectural design.

ZTC experience and production facts

35+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

Systems available

ZTC supplies timber frame panels, CLT structures, hybrid systems and infill façade panels. Technical information is available on CE/ETA certification, Hundegger CNC production and CLT panels. To discuss your design, contact us.

Technical coordination workflow

We develop the structural and manufacturing design with the client's architect and project team. The architectural design remains their responsibility.

  1. 1.

    System selection

    We assess timber frame, CLT, hybrid or infill façade options together with the architect.

  2. 2.

    Interface definition

    We coordinate openings and service penetrations with the fire and acoustic requirements.

  3. 3.

    Production preparation

    Before manufacturing, we agree structural dimensions and tolerances and confirm lifting constraints.

  4. 4.

    Manufacturing and delivery

    We manufacture the elements, apply CE marking and deliver them to site.

  5. 5.

    Assembly and handover

    We assemble the structure in the agreed sequence and within the agreed scope.

Information required from the architect

Coordination points

  • Architectural plans and building geometry.
  • Openings, façade design and visible timber finishes.
  • Fire and acoustic requirements.
  • Transport and assembly sequence constraints.

What ZTC does not produce

  • Architectural design development.
  • Foundation and MEP engineering.
  • Obtaining local building permits.
  • Universal compliance with every European building regulation.

Certification and production precision

CE and ETA-21/0014

European Technical Assessment for structural systems.

±1 mm CNC

Hundegger processing precision in Vītoliņi.

FSC and PEFC

Available on request.

Experience since 1991

400+ completed projects in 14 European countries.

Frequently asked questions

Answers about technologies, energy performance, construction process and comparisons.

Comfort panels use mineral wool within the frame. Premium and Lux use wood fibre or cellulose insulation; Premium adds a 22 mm wood fibre windproof board, while Lux adds a 40 mm STEICO THERM wood fibre layer. Additional 45 mm internal insulation and plasterboard are excluded from these packages. For Comfort, Premium and Lux, roof panel insulation is 50 mm thicker than the insulation in the corresponding external wall.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally, a vapour control layer internally, and membranes are carefully taped across the building.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally and a vapour control layer internally, with membranes carefully taped across the building.

Airborne sound insulation in timber houses can be very good, especially with cellulose or wood fibre. Impact sound in intermediate floors should be addressed with appropriate floor and ceiling solutions.

Airborne sound performance in timber houses can be very good. Impact sound in intermediate floors is addressed with appropriate floor and ceiling solutions.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or where exposed solid timber walls are desired.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or exposed solid timber walls.

The wall U-value is calculated for the individual project using all wall layers, material properties and structural junctions. Comfort, Premium and Lux differ in frame, insulation and barrier construction; the panel specification name alone does not determine a guaranteed U-value.

The n50 value describes the airtightness of the whole building. The target is set in the design and the achieved result is verified by a building airtightness test. Joints, windows, doors and assembly quality also affect the result; the panel specification alone does not guarantee a particular n50 value.

Yes, ZTC structures can be adapted for A+ energy performance class. The result depends not only on wall insulation but also on building form, windows, orientation, airtightness, ventilation and heating systems.

Yes, ZTC structures can be adapted for A+ energy performance class. The result depends on insulation, thermal bridges, building airtightness, windows, orientation, ventilation and heating systems.

A preliminary energy assessment is carried out during the design stage before construction and the building authority process. It helps determine whether additional insulation or other technical measures are needed.

A preliminary energy assessment is carried out during the design stage before construction starts. It helps determine whether additional insulation or other technical measures are needed. After construction, a final assessment follows to confirm compliance.

Yes, timber structures are suitable for the Latvian climate when correctly designed, insulated and built. ZTC structures are adapted to the energy performance requirements of each project.

Yes, timber structures are suitable for the Latvian climate when correctly designed, insulated and built. ZTC structures are adapted to each project’s energy performance requirements.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.

ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.

ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.

ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.

ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.

ZTC manufactures and assembles houses itself, has 34 years of experience, CE and ETA-21/0014 certification, Hundegger CNC precision of ±1 mm and an industrial insulation installation system.

ZTC manufactures and assembles houses itself. The company has 34 years of experience, CE marking and ETA-21/0014, Hundegger CNC precision of ±1 mm and an industrial Isofloc insulation system.

What partners say about technical collaboration

In their Google reviews, partners describe the precision, communication and quality of work on technically demanding projects.

Google review

We are Premium Living AS in Norway and built two houses with this company. We were very satisfied. We sold the last project 2 years ago when I write this review, and the first house was built 4 years ago. With both houses, the production, planning and timing all went smooth and well organised. Right now, all three buyers are pleased, and we haven't received a single complaint about flaws or even blemishes. Even during the Covid lockdowns there was no doubt that our investments and cooperation with ZTC were solid. We recommend, and anyone that has questions can ask ZTC for our reference.

Google review

Very good experience with all the ZTC staff. Easy to work with, very professional, fast and clear in answering any question during all the projects done. I can only recommend ZTC.

Google review

Ļoti profesionāls un ieinteresēts darbs no ZTC puses, lai maksimāli izpildītu klienta vēlmes mājas būvniecībā, ieguldot laiku visu detaļu precizēšanā, kā rezultātā pašas būvniecības laikā neko nevajadzēja koriģēt un ir tapusi patiesi kvalitatīva māja. Atzinīgus vārdus par mājas būvniecības kvalitāti saņēmām no visiem speciālistiem, ar kuriem sadarbojāmies vēlāk - liekot logus un durvis, jumta segumu un apdari. Paldies par paveikto un varam tikai ieteikt citiem izmantot ZTC pakalpojums māju būvniecībā! Pateicībā, Irēna un Janeks

Discuss your structural design

Send us the architectural plans and requirements so we can assess the structure and how to manufacture it.